top of page
Search

Crystal Lake District 155 Planning $14.5 Million In Summer Building Upgrades

  • jamesmcconnell
  • Mar 10, 2019
  • 1 min read

District 155 Assistant Superintendent of Finance and Operations Jeremy Davis has announced that, without increasing the 2018 operating tax levy, the district will spend $14,552,000.00 on 22 different summer construction projects spread across all schools in the district.

  • Cary Grove High School will get air conditioning in the science wing, remodeling of the learning kitchen classroom, replacement of a tennis court, and parking lot revisions.

  • Crystal Lake Central will get sir conditioning on the English wing, remodeling of the learning kitchen classroom, asbestos abatement and water line replacement.

  • Prairie Ridge High School will get HVAC improvements, learning kitchen classroom remodeling and new water mixing valves.

  • Crystal Lake South High School will get entrance sidewalk replacement.

  • District Administration offices will get HVAC and lighting improvements.

Work will begin immediately after school is dismissed for the summer. “We’ve only got a certain number of days in the summertime and we use them all,” Davis said.

Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

© 2023 by The HANDYMAN Ltd. Proudly made by Wix.com.

  • w-facebook
  • Twitter Clean
bottom of page