top of page
Search

McHenry Riverwalk Phase Three Moving Forward

  • jamesmcconnell
  • Feb 10, 2019
  • 1 min read

Not for Profit McHenry Riverwalk Foundation will be spending $454,534.00 this spring to complete a connection between the pedestrian bridge on the north side of Boone Creek at Riverside Drive to the Riverwalk on the Fox at Miller’s Dream Marine. Foundation President John Smith announced the expected completion of phase three in June 2019. The foundation has also received bids for construction of a gazebo on Miller Point to serve as a venue for musical performances and weddings.

Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

© 2023 by The HANDYMAN Ltd. Proudly made by Wix.com.

  • w-facebook
  • Twitter Clean
bottom of page